Water Works View all images of Water Works |
1872 | water works built |
c1905 | razed |
1871 provided adequate supply of water for general purposes mulberry street waterworks plant in sunset park 1871-2 1872 became obsolete, in 1895 land was purchaed on shawnee dr (up the river from the old plant) construction began above bee slough 6.28/1895 ec will build anew http://docs.newsbank.com/openurl?ctx_ver=z39.88-2004&rft_id=info:sid/iw.newsbank.com:EANX-NB&rft_val_format=info:ofi/fmt:kev:mtx:ctx&rft_dat=144EDB2D4FD5C988&svc_dat=HistArchive:ahnpdoc&req_dat=0F92E8ECA61B06A1 delays pushed into 1897 prep work? or issue of funding weikel constru 1898 new plans leave out ornamental stone and used brick construction begun 10/1898 new one was put into operation 1900 old one planed to be razed 1905 pumping sta 1910? Now where Riverside merges with Veterans Memorial Pkwy