Repairing the Water Works intake
Capt. Arch Hollerbach supervising the repair on the intakes of the city pumping station on the river bank above the city . The view shows the river side of the water station supported by scaffolding and the intake pipe connections protruding from the well. The removal of the old intake pipes was finished last week.